| Construction of power transmission projects are undertaken by a joint-venture between MRCB and Pemodalan Nasional Berhad. Called Transmission Technology Sdn. Bhd. (TTSB), this premier local turnkey contractor accumulates expertise in engineering, construction and commissioning services to deliver high voltage transmission lines and sub-stations.
|
|
| A 500kV overhead transmission lines and 275kV interconnection transmission lines project completed for national energy provider, Tenaga Nasional Berhad.
|
|
| Completed in December 2007 at an estimated cost of RM400 million, this is the largest ever such project in Malaysia. Upon delivery, it has successfully completed the power infrastructure backbone for Sabah. The project involved a massive operation of four sub-stations and the nation’s longest transmission line, bringing electricity to all consumers and industries, from Kota Kinabalu in the West to Sandakan in the East.
|
|
| Involves implementation of 275kV hybrid transmission lines and underground cables between Salak South and Pantai substations, capable of transmitting 1,000 MVA power on each circuit via 275kV GIS Switching Station at Salak South to 275kV GIS Extension Bays at Pantai.
|
|
| |
- Paka Power Station
- Pasir Gudang Power Station
- Connaught Bridge Power Station
- Serdang Power Station
- Kapar Power Station
- Kuala Langat Power Station
- Teluk Gong Power Station
- Sepang Power Plant (earthworks)
- Port Dickson Sub-station
|
- 275kV Centre Area Re-enforcement Project (A & B)
- 275kV GIS, Seremban – Port Dickson
- 275kV Melaka – Kelemak
- 275kV Lenggeng – National University (NUNI)
- 275kV Gelang Patah – Bukit Batu
- 275/132kV Teluk Kalong
- Backbone for TNB Telecommunication Network
- Scada for TTSB
|
|
|
 |
|
 |
|
|
 |
 |
 |
|
 |
 |